Markley Group One Summer Street Boston is an operational data center operated by Markley in Boston, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Markley |
| Networks | 82 networks, 1 internet exchanges PeeringDB. |
| Also known as | DataBank Boston (BOS1) · Crown Castle Boston (1 Summer) |
| Address | 1 Summer Street |
| Coordinates | 42.35469, -71.06027 |
| Website | markleygroup.com |
Power and grid
| Nearest high-voltage substation | Kingston Street Substation, 345 kV, 200 m away (Eversource) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 30 |
| Utility | Massachusetts Bay Trans Authority (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 2.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.2 GW in 130 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 403 g CO₂ per kWh (Massachusetts, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1% |
| Industrial power price | USD 0.200 per kWh (Massachusetts, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.82 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Massachusetts) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Markley Group One Summer Street Boston to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kingston Street Substation (345 kV), about 200 m away. The local utility is Massachusetts Bay Trans Authority, in the ISNE balancing area.
How clean is the power for Markley Group One Summer Street Boston?
The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.
Who operates Markley Group One Summer Street Boston?
Markley.
Data centers near Boston
- 230 Congress 508 m
- Lumen Boston 2.6 km
- Hub Express System 2.9 km
- CoreSite - Boston (BO1) 2.9 km · 12 MW
- Evocative BOS1 3.1 km
- Expedient Boston 5.8 km
- Centersquare Boston (BOS4-A) 8.1 km
- EXA CLS Lynn 14.2 km
More Markley data centers
- Markley Group Lowell United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.