CoreSite - Boston (BO1) is an operational data center operated by CoreSite in Somerville, United States. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorCoreSite
Facility power12 MW (range 6.2 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,411 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks41 networks, 2 internet exchanges
PeeringDB.
Also known asColoSpace - Somerville, MA · CoreSite BO1
Address70 Innerbelt Rd
Coordinates42.37670, -71.07976
Websitecoresite.com

Power and grid

Nearest high-voltage substationProspect Street Substation, 115 kV, 1.3 km away (Eversource)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMystic 345kV Substation, 345 kV, 2.1 km away
HV substations within 10 km29
UtilityMassachusetts Bay Trans Authority (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineAlgonquin Gas Trans Co, interstate pipeline, 400 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.6 GW in 134 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity403 g CO₂ per kWh (Massachusetts, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1%
Industrial power priceUSD 0.200 per kWh (Massachusetts, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days356 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.82 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Massachusetts)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CoreSite - Boston (BO1) use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is CoreSite - Boston (BO1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Prospect Street Substation (115 kV), about 1.3 km away. The local utility is Massachusetts Bay Trans Authority, in the ISNE balancing area.

How clean is the power for CoreSite - Boston (BO1)?

The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.

Who operates CoreSite - Boston (BO1)?

CoreSite.

Data centers near Somerville

More CoreSite data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.