CoreSite - Atlanta (AT2)
CoreSite - Atlanta (AT2) is an operational data center operated by CoreSite in Marietta, United States. Our footprint estimate of its power is about 7.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CoreSite |
| Facility power | 7.2 MW (range 3.6 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,020 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks, 2 internet exchanges PeeringDB. |
| Also known as | CoreSite AT2 - Marietta Data Center |
| Address | 1130 Powers Ferry Pl |
| Coordinates | 33.92555, -84.48165 |
| Website | coresite.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 2.9 km away |
| HV substations within 10 km | 36 |
| Utility | City Of Marietta (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 20 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.3 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,020 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreSite - Atlanta (AT2) use?
We estimate the facility power at about 7.2 MW. Estimate from building footprint, low confidence.
How close is CoreSite - Atlanta (AT2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 200 m away. The local utility is City Of Marietta, in the SOCO balancing area.
How clean is the power for CoreSite - Atlanta (AT2)?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates CoreSite - Atlanta (AT2)?
CoreSite.
Data centers near Marietta
- PhoenixNAP ATLANTA 264 m
- Equinix AT4 - Atlanta 4.2 km
- Coloblox Data Centers ATL1 4.3 km
- Coloblox Data Centers ATL3 4.4 km
- 365 Data Centers Smyrna (GA2) 10.1 km
- Atlanta Tech Village 13.2 km
- Colo@ (Buckhead) 13.9 km
- Lincoln Rackhouse Atlanta 14.3 km
More CoreSite data centers
- CoreSite - Reston (VA3) United States
- CoreSite - Los Angeles (LA1) One Wilshire United States
- CoreSite - Los Angeles (LA2) United States
- CoreSite - Denver (DE1) United States
- CoreSite - Reston (VA1) United States
- Coresite - Milpitas (SV2) United States
- CoreSite - Boston (BO1) United States
- CoreSite - Secaucus (NY2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.