Data Center Directory

Equinix AT4 - Atlanta

Equinix AT4 - Atlanta is an operational data center operated by Equinix in Atlanta, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorEquinix
Networks5 networks, 1 internet exchanges
PeeringDB.
Address450 Interstate North Parkway
Coordinates33.89545, -84.45361
Websiteequinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at4

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 900 m away (Georgia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 1.9 km away
HV substations within 10 km42
UtilityGeorgia Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 20 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km6.3 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days1,020 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Equinix AT4 - Atlanta to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 900 m away. The local utility is Georgia Power Co, in the SOCO balancing area.

How clean is the power for Equinix AT4 - Atlanta?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Equinix AT4 - Atlanta?

Equinix.

Data centers near Atlanta

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.