Data Center Directory

CoreSite - Secaucus (NY2)

CoreSite - Secaucus (NY2) is an operational data center operated by CoreSite in Secaucus, United States. Our footprint estimate of its power is about 5.8 MW.

Key facts

StatusOperational
OperatorCoreSite
Facility power5.8 MW (range 2.3 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 48,403 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks32 networks, 3 internet exchanges
PeeringDB.
Also known asCoreSite - Secaucus (NY3) · CoreSite Secaucus Campus · CoreSite NY3
Address2 Emerson Lane
Coordinates40.78450, -74.06512
Websitecoresite.com

Power and grid

Nearest high-voltage substationHomestead Substation, 230 kV, 2 km away (Public Service Enterprise Group)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km38
UtilityPublic Service Elec & Gas Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 1.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km20 GW in 139 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.87 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CoreSite - Secaucus (NY2) use?

We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.

How close is CoreSite - Secaucus (NY2) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Homestead Substation (230 kV), about 2 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.

How clean is the power for CoreSite - Secaucus (NY2)?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.

Who operates CoreSite - Secaucus (NY2)?

CoreSite.

Data centers near Secaucus

More CoreSite data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.