NJDC2 - 300 J F Kennedy Blvd
NJDC2 - 300 J F Kennedy Blvd is an operational data center operated by Colocation America in Secaucus, United States. Our footprint estimate of its power is about 64 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Colocation America |
| Facility power | 64 MW (range 32 MW to 103 MW) Estimate from building footprint, low confidence. Footprint estimate: about 53,613 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 27,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix New York Secaucus NY2 |
| Address | 275 Hartz Way |
| Coordinates | 40.77782, -74.07591 |
| Website | colocationamerica.com/data-center-locations/new-jersey.htm |
Power and grid
| Nearest high-voltage substation | Penhorn Substation, 230 kV, 2.4 km away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 39 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 20 GW in 141 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NJDC2 - 300 J F Kennedy Blvd use?
We estimate the facility power at about 64 MW. Estimate from building footprint, low confidence.
How close is NJDC2 - 300 J F Kennedy Blvd to the power grid?
The nearest high-voltage substation in OpenStreetMap is Penhorn Substation (230 kV), about 2.4 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for NJDC2 - 300 J F Kennedy Blvd?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates NJDC2 - 300 J F Kennedy Blvd?
Colocation America.
Data centers near Secaucus
- Equinix NY2/NY4/NY5/NY6 - New York, Secaucus 319 m · 29 MW
- Equinix NY3 - New York, Secaucus 725 m · 9.2 MW
- H5 Data Centers Secaucus (NJ01) 779 m
- H5 Secaucus 846 m
- InterServer Teb2 934 m
- Centersquare New Jersey (EWR5) 1.1 km · 21 MW
- CoreSite - Secaucus (NY2) 1.2 km · 5.8 MW
- Evocative EWR1 1.3 km · 17 MW
More Colocation America data centers
- PDC1 - 9999 Hamilton blvd United States
- PDC2 - 1000 Adams ave United States
- BDC1 - 34 Saint Martin Dr United States
- CDC4 - 1808 Swift Dr United States
- HDC1 - 108 Bank St United States
- LADC5 - 650 S Grand Ave United States
- PDC3 - 3949 Schelden Cir United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.