NJDC2 - 300 J F Kennedy Blvd is an operational data center operated by Colocation America in Secaucus, United States. Our footprint estimate of its power is about 64 MW.

Key facts

StatusOperational
OperatorColocation America
Facility power64 MW (range 32 MW to 103 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 53,613 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 27,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asEquinix New York Secaucus NY2
Address275 Hartz Way
Coordinates40.77782, -74.07591
Websitecolocationamerica.com/data-center-locations/new-jersey.htm

Power and grid

Nearest high-voltage substationPenhorn Substation, 230 kV, 2.4 km away (Public Service Enterprise Group)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km39
UtilityPublic Service Elec & Gas Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 1.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km20 GW in 141 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.87 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NJDC2 - 300 J F Kennedy Blvd use?

We estimate the facility power at about 64 MW. Estimate from building footprint, low confidence.

How close is NJDC2 - 300 J F Kennedy Blvd to the power grid?

The nearest high-voltage substation in OpenStreetMap is Penhorn Substation (230 kV), about 2.4 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.

How clean is the power for NJDC2 - 300 J F Kennedy Blvd?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.

Who operates NJDC2 - 300 J F Kennedy Blvd?

Colocation America.

Data centers near Secaucus

More Colocation America data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.