PDC3 - 3949 Schelden Cir
PDC3 - 3949 Schelden Cir is an operational data center operated by Colocation America in Bethlehem, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Colocation America |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Also known as | TierPoint Lehigh Valley |
| Address | 3949 Schelden Cir |
| Coordinates | 40.67501, -75.37811 |
| Website | colocationamerica.com/data-center-locations/philadelphia |
Power and grid
| Nearest high-voltage substation | Quarry Substation, 230 kV, 6.3 km away (PPL) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Ppl Electric Utilities Corp (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 8.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.2 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 387 g CO₂ per kWh (Pennsylvania, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3% |
| Industrial power price | USD 0.105 per kWh (Pennsylvania, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 508 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Pennsylvania) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is PDC3 - 3949 Schelden Cir to the power grid?
The nearest high-voltage substation in OpenStreetMap is Quarry Substation (230 kV), about 6.3 km away. The local utility is Ppl Electric Utilities Corp, in the PJM balancing area.
How clean is the power for PDC3 - 3949 Schelden Cir?
The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.
Who operates PDC3 - 3949 Schelden Cir?
Colocation America.
Data centers near Bethlehem
- TierPoint Bethlehem 584 m
- Flexential Allentown Data Center 8.0 km · 9.3 MW
- PDC1 - 9999 Hamilton blvd 27.6 km · 20 MW
- Verizon Branchburg NEC Datacenter 57.0 km · 10 MW
- Flexential - Philadelphia/Collegeville (PHL01) 58.8 km · 13 MW
- Direct LTx Reading 60.6 km
- Goldman Sachs 60.9 km · 46 MW
- Vital Records 60.9 km · 1 MW
More Colocation America data centers
- NJDC2 - 300 J F Kennedy Blvd United States
- PDC1 - 9999 Hamilton blvd United States
- PDC2 - 1000 Adams ave United States
- BDC1 - 34 Saint Martin Dr United States
- CDC4 - 1808 Swift Dr United States
- HDC1 - 108 Bank St United States
- LADC5 - 650 S Grand Ave United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.