PDC2 - 1000 Adams ave

PDC2 - 1000 Adams ave is an operational data center operated by Colocation America in Audubon, United States. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorColocation America
Facility power13 MW (range 6.3 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,506 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks
PeeringDB.
Also known asTierPoint Valley Forge
Address1000 Adams ave
Coordinates40.12180, -75.42101
Websitecolocationamerica.com/data-center-locations/philadelphia

Power and grid

Nearest high-voltage substationBetzwood Substation, 230 kV, 800 m away (PECO)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
UtilityPeco Energy Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 700 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km10 GW in 71 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity387 g CO₂ per kWh (Pennsylvania, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3%
Industrial power priceUSD 0.105 per kWh (Pennsylvania, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.4 °C (2001 to 2025)
Cooling degree days618 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayLow - Medium (10-20%) (Pennsylvania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does PDC2 - 1000 Adams ave use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is PDC2 - 1000 Adams ave to the power grid?

The nearest high-voltage substation in OpenStreetMap is Betzwood Substation (230 kV), about 800 m away. The local utility is Peco Energy Co, in the PJM balancing area.

How clean is the power for PDC2 - 1000 Adams ave?

The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.

Who operates PDC2 - 1000 Adams ave?

Colocation America.