Key facts

StatusOperational
OperatorVerizon
Facility power10 MW (range 5.1 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,437 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.59956, -74.70997

Power and grid

Nearest high-voltage substationReadington Substation, 230 kV, 3.2 km away (Jersey Central Power and Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
UtilityJersey Central Power & Lt Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 2.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km10 GW in 164 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days565 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.92 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Verizon Branchburg NEC Datacenter use?

We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.

How close is Verizon Branchburg NEC Datacenter to the power grid?

The nearest high-voltage substation in OpenStreetMap is Readington Substation (230 kV), about 3.2 km away. The local utility is Jersey Central Power & Lt Co, in the PJM balancing area.

How clean is the power for Verizon Branchburg NEC Datacenter?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.

Who operates Verizon Branchburg NEC Datacenter?

Verizon.

Data centers near Bridgewater

More Verizon data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.