Data Center Directory

Verizon data center in Narrabundah

Verizon data center in Narrabundah is an operational data center operated by Verizon in Narrabundah, Australia. Our footprint estimate of its power is about 2.4 MW.

Key facts

StatusOperational
OperatorVerizon
Facility power2.4 MW (range 1.2 MW to 3.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,997 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGladstone Street 105
Coordinates-35.32137, 149.18054

Power and grid

Nearest high-voltage substationEast Lake Zone Substation, 132 kV, 1.6 km away (Evoenergy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 500 kV, 7.3 km away
HV substations within 10 km8
Power plants within 50 km194 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.3 °C (2001 to 2025)
Cooling degree days133 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.79 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayMedium - High (20-40%) (Australian Capital Territory)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Verizon data center in Narrabundah use?

We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.

How close is Verizon data center in Narrabundah to the power grid?

The nearest high-voltage substation in OpenStreetMap is East Lake Zone Substation (132 kV), about 1.6 km away.

How clean is the power for Verizon data center in Narrabundah?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Verizon data center in Narrabundah?

Verizon.

Data centers near Narrabundah

More Verizon data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.