Fyshwick 2

Fyshwick 2 is an operational data center operated by Canberra Data Centres in Narrabundah, Australia. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorCanberra Data Centres
Facility power13 MW (range 6.7 MW to 22 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,228 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asFyshwick 1
AddressTom Price Street 11
Coordinates-35.33803, 149.18311
Websitecdcdc.com.au/fyshwick-campus-one

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 1.6 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 500 kV, 6.3 km away
HV substations within 10 km9
Power plants within 50 km194 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.3 °C (2001 to 2025)
Cooling degree days133 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.79 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayMedium - High (20-40%) (Australian Capital Territory)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Fyshwick 2 use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Fyshwick 2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.6 km away.

How clean is the power for Fyshwick 2?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Fyshwick 2?

Canberra Data Centres.

Data centers near Narrabundah

More Canberra Data Centres data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.