CSIRO Virga
CSIRO Virga is an operational AI data center operated by CSIRO in Jerrabomberra, Australia. Its power is about 0.6 MW. Epoch AI estimates about 448 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | CSIRO |
| Facility power | 0.6 MW Reported (Epoch AI or owner data) |
| AI compute | 448 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 448 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 270 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | CDC Canberra HU1 · CDC Canberra HU2 · CDC Canberra HU3 · CDC Hume Datacentre 1 · CDC Hume Datacentre 2 |
| Address | 54 Sheppard St, Hume ACT 2620, Australia |
| Coordinates | -35.38893, 149.16793 |
| Website | cdc.com |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 133 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.79 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| CSIRO Virga | NVIDIA H100 SXM5 80GB | 448 | 0.6 MW | 2024-07-11 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CSIRO Virga use?
Public data puts the facility power at about 0.6 MW. Reported (Epoch AI or owner data).
What chips does CSIRO Virga use?
Reported chips: NVIDIA H100 SXM5 80GB.
How clean is the power for CSIRO Virga?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates CSIRO Virga?
CSIRO.
Data centers near Jerrabomberra
- CDC Hume Datacentre 3 63 m · 7.8 MW
- Iron Mountain 245 m · 23 MW
- CDC Canberra HU4 824 m
- Hume 4 863 m · 18 MW
- Department of Defence data center in Queanbeyan 5.0 km · 6.7 MW
- CDC Canberra FY1 5.8 km
- Fyshwick 2 5.8 km · 13 MW
- Verizon data center in Narrabundah 7.6 km · 2.4 MW