Iron Mountain
Iron Mountain is an operational data center operated by Iron Mountain in Jerrabomberra, Australia. Our footprint estimate of its power is about 23 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Iron Mountain |
| Facility power | 23 MW (range 12 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,568 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Sheppard Street 34-42, 2620 |
| Coordinates | -35.38763, 149.17010 |
| Website | ironmountain.com/en-au |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 133 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.79 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Iron Mountain use?
We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.
How clean is the power for Iron Mountain?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Iron Mountain?
Iron Mountain.
Data centers near Jerrabomberra
- CDC Hume Datacentre 3 239 m · 7.8 MW
- CSIRO Virga 245 m · 0.6 MW
- CDC Canberra HU4 1.1 km
- Hume 4 1.1 km · 18 MW
- Department of Defence data center in Queanbeyan 4.8 km · 6.7 MW
- CDC Canberra FY1 5.6 km
- Fyshwick 2 5.6 km · 13 MW
- Verizon data center in Narrabundah 7.4 km · 2.4 MW
More Iron Mountain data centers
- Iron Mountain Data Center - New Jersey (NJE-1) United States
- Iron Mountain data center in Sandston United States
- Iron Mountain Data Center - Manassas (VA-1) United States
- Iron Mountain FRA-1 Germany
- Iron Mountain VA-3 United States
- Iron Mountain Data Center - Manassas (VA-2) United States
- Iron Mountain VA-7 United States
- Iron Mountain Data Center - London (LON-1) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.