Iron Mountain data center in Sandston

Iron Mountain data center in Sandston is an operational data center operated by Iron Mountain in Sandston, United States. Our footprint estimate of its power is about 41 MW.

Key facts

StatusOperational
OperatorIron Mountain
Facility power41 MW (range 16 MW to 102 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 338,564 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 18,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates37.49810, -77.23481

Power and grid

Nearest high-voltage substationWhite Oak Substation, 230 kV, 1.7 km away (Dominion Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineVirginia Natural Gas Co, intrastate pipeline, 200 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.7 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days940 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.31 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Iron Mountain data center in Sandston use?

We estimate the facility power at about 41 MW. Estimate from building footprint, low confidence.

How close is Iron Mountain data center in Sandston to the power grid?

The nearest high-voltage substation in OpenStreetMap is White Oak Substation (230 kV), about 1.7 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Iron Mountain data center in Sandston?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Iron Mountain data center in Sandston?

Iron Mountain.

Data centers near Sandston

More Iron Mountain data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.