Goldman Sachs
Goldman Sachs is an operational data center in Bridgewater Township, United States. Our footprint estimate of its power is about 46 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 46 MW (range 23 MW to 74 MW) Estimate from building footprint, low confidence. Footprint estimate: about 38,341 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 20,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | US 202 755, 08807, Bridgewater Township |
| Coordinates | 40.57037, -74.67033 |
Power and grid
| Nearest high-voltage substation | Readington Substation, 230 kV, 2.5 km away (Jersey Central Power and Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 13 GW in 173 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Goldman Sachs use?
We estimate the facility power at about 46 MW. Estimate from building footprint, low confidence.
How close is Goldman Sachs to the power grid?
The nearest high-voltage substation in OpenStreetMap is Readington Substation (230 kV), about 2.5 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for Goldman Sachs?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Data centers near Bridgewater Township
- Verizon Branchburg NEC Datacenter 4.7 km · 10 MW
- Vital Records 4.8 km · 1 MW
- 365 Data Centers Bridgewater (BW1) 8.2 km · 4 MW
- Digital Realty data center in Manville 10.4 km · 11 MW
- BNY Mellon Somerset 10.6 km · 13 MW
- CyrusOne NJ-1 11.1 km · 40 MW
- Data center in Somerset 11.3 km · 32 MW
- Data center in Manville 11.5 km · 3.3 MW
Sources
Correct this page or get the data