Centersquare New Jersey (EWR5)
Centersquare New Jersey (EWR5) is an operational data center operated by Centersquare in Secaucus, United States. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,325 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 15 networks, 2 internet exchanges PeeringDB. |
| Also known as | Centersquare NYC3 Data Center |
| Address | 15 Enterprise Avenue N |
| Coordinates | 40.78616, -74.06912 |
| Website | centersquaredc.com/data-centers/new-york-new-jersey |
Power and grid
| Nearest high-voltage substation | Homestead Substation, 230 kV, 2.4 km away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 37 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 1.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 20 GW in 139 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centersquare New Jersey (EWR5) use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How close is Centersquare New Jersey (EWR5) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Homestead Substation (230 kV), about 2.4 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for Centersquare New Jersey (EWR5)?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates Centersquare New Jersey (EWR5)?
Centersquare.
Data centers near Secaucus
- Evocative EWR1 191 m · 17 MW
- CoreSite - Secaucus (NY2) 384 m · 5.8 MW
- InterServer Teb2 391 m
- H5 Secaucus 503 m
- H5 Data Centers Secaucus (NJ01) 620 m
- Equinix NY2/NY4/NY5/NY6 - New York, Secaucus 888 m · 29 MW
- NJDC2 - 300 J F Kennedy Blvd 1.1 km · 64 MW
- Equinix NY3 - New York, Secaucus 1.2 km · 9.2 MW
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
- Centersquare Dallas (DFW2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.