Centersquare Chicago (ORD4) is an operational data center operated by Centersquare in Lisle, United States. Our footprint estimate of its power is about 32 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Facility power | 32 MW (range 16 MW to 51 MW) Estimate from building footprint, low confidence. Footprint estimate: about 26,557 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks, 1 internet exchanges PeeringDB. |
| Also known as | Centersquare Lisle ORD4 Data Center |
| Address | 4513 Western Avenue |
| Coordinates | 41.80241, -88.09466 |
| Website | centersquaredc.com/data-centers/chicago |
Power and grid
| Nearest high-voltage substation | ComEd Lisle 138kV-345kV Substation, 345 kV, 3 km away (Commonwealth Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Northern Illinois Gas Co, intrastate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 11 GW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centersquare Chicago (ORD4) use?
We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.
How close is Centersquare Chicago (ORD4) to the power grid?
The nearest high-voltage substation in OpenStreetMap is ComEd Lisle 138kV-345kV Substation (345 kV), about 3 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.
How clean is the power for Centersquare Chicago (ORD4)?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Centersquare Chicago (ORD4)?
Centersquare.
Data centers near Lisle
- Vultr Chicago Cluster 60 m · 4.6 MW
- CyrusOne Chicago (Lombard) 7.5 km
- NetSource Communications, Inc 8.4 km · 2 MW
- Equinix CH7 - Westmont 10.2 km · 4.3 MW
- Lincoln Rackhouse Aurora 10.7 km · 10 MW
- Edged Chicago ORD01-01 12.1 km · 20 MW
- Edged Chicago ORD01-02 12.2 km · 126 MW
- CyrusOne Aurora I 12.3 km · 49 MW
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
- Centersquare Dallas (DFW2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.