Equinix CH7 - Westmont is an operational data center operated by Equinix in Westmont, United States. Our footprint estimate of its power is about 4.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 4.3 MW (range 2.1 MW to 6.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,580 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | Equinix Chicago Data CH7 |
| Address | 111 Plaza Dr |
| Coordinates | 41.81260, -87.97283 |
| Website | equinix.co.uk/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch7 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 3.6 km away (Commonwealth Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | ComEd Lisle 138kV-345kV Substation, 345 kV, 7.3 km away |
| HV substations within 10 km | 9 |
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Northern Illinois Gas Co, intrastate pipeline, 1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 9.7 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix CH7 - Westmont use?
We estimate the facility power at about 4.3 MW. Estimate from building footprint, low confidence.
How close is Equinix CH7 - Westmont to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 3.6 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.
How clean is the power for Equinix CH7 - Westmont?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Equinix CH7 - Westmont?
Equinix.
Data centers near Westmont
- Serverfarm CH2 Oak Brook / Chicago 4.5 km
- US Signal - Oak Brook 4.6 km
- CyrusOne Chicago (Lombard) 6.2 km
- CDC4 - 1808 Swift Dr 6.3 km
- Centersquare Chicago (ORD4) 10.2 km · 32 MW
- Vultr Chicago Cluster 10.2 km · 4.6 MW
- Argonne NL Aurora 10.5 km · 60 MW
- Datacenter (386) 11.7 km · 1.9 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.