Datacenter (386) is an operational data center operated by UChicago Argonne in Lemont, United States. Our footprint estimate of its power is about 1.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | UChicago Argonne |
| Facility power | 1.9 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,601 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.70713, -87.97596 |
Power and grid
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Northern Illinois Gas Co, intrastate pipeline, 500 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.8 °C (2001 to 2025) |
| Cooling degree days | 483 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.84 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter (386) use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Datacenter (386)?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Datacenter (386)?
UChicago Argonne.
Data centers near Lemont
- Argonne NL Aurora 1.3 km · 60 MW
- Equinix CH7 - Westmont 11.7 km · 4.3 MW
- Centersquare Chicago (ORD4) 14.5 km · 32 MW
- Vultr Chicago Cluster 14.5 km · 4.6 MW
- Serverfarm CH2 Oak Brook / Chicago 15.6 km
- US Signal - Oak Brook 15.8 km
- CyrusOne Chicago (Lombard) 16.4 km
- CDC4 - 1808 Swift Dr 17.0 km