Datacenter (386) is an operational data center operated by UChicago Argonne in Lemont, United States. Our footprint estimate of its power is about 1.9 MW.

Key facts

StatusOperational
OperatorUChicago Argonne
Facility power1.9 MW (range 1 MW to 3.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,601 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 810 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.70713, -87.97596

Power and grid

UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNorthern Illinois Gas Co, intrastate pipeline, 500 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.8 °C (2001 to 2025)
Cooling degree days483 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.84 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Datacenter (386) use?

We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Datacenter (386)?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Datacenter (386)?

UChicago Argonne.

Data centers near Lemont

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.