Data Center Directory

CyrusOne Chicago (Lombard)

CyrusOne Chicago (Lombard) is an operational data center operated by CyrusOne in Lombard, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCyrusOne
Networks5 networks, 1 internet exchanges
PeeringDB.
Also known asCloudnium Chicago (Lombard)
Address1850 Springer Drive
Coordinates41.84918, -88.02957
Websitecyrusone.com

Power and grid

Nearest high-voltage substationGlen Ellyn Substation, 138 kV, 1.7 km away (Commonwealth Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationComEd Lombard Substation, 345 kV, 5.3 km away
HV substations within 10 km10
UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNorthern Illinois Gas Co, intrastate pipeline, 500 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.1 GW in 35 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.5 °C (2001 to 2025)
Cooling degree days465 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is CyrusOne Chicago (Lombard) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Glen Ellyn Substation (138 kV), about 1.7 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.

How clean is the power for CyrusOne Chicago (Lombard)?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates CyrusOne Chicago (Lombard)?

CyrusOne.

Data centers near Lombard

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.