Edged Chicago ORD01-02
Edged Chicago ORD01-02 is an operational data center operated by Edged in Aurora, United States. Our footprint estimate of its power is about 126 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Edged |
| Facility power | 126 MW (range 63 MW to 201 MW) Estimate from building footprint, low confidence. Footprint estimate: about 104,723 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 54,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Bilter Road 2805, 60502, Aurora |
| Coordinates | 41.80472, -88.24211 |
Power and grid
| Nearest high-voltage substation | Electric Junction Substation, 345 kV, 1.1 km away (Commonwealth Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 17 |
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Natural Gas PL Co of Am, interstate pipeline, 0 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 10.0 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Edged Chicago ORD01-02 use?
We estimate the facility power at about 126 MW. Estimate from building footprint, low confidence.
How close is Edged Chicago ORD01-02 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Electric Junction Substation (345 kV), about 1.1 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.
How clean is the power for Edged Chicago ORD01-02?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Edged Chicago ORD01-02?
Edged.
Data centers near Aurora
- Edged Chicago ORD01-01 259 m · 20 MW
- CyrusOne CHI9 437 m · 32 MW
- CyrusOne Aurora I 888 m · 49 MW
- CyrusOne data center in Aurora 1.1 km · 22 MW
- NetSource Communications, Inc 3.9 km · 2 MW
- Lincoln Rackhouse Aurora 4.2 km · 10 MW
- SBA Edge, LLC 7.9 km
- Data center in West Chicago 11.3 km · 1.4 MW
More Edged data centers
- Edged Chicago ORD01-01 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.