Data Center Directory

CyrusOne data center in Aurora

CyrusOne data center in Aurora is an operational data center operated by CyrusOne in Aurora, United States. Our footprint estimate of its power is about 22 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power22 MW (range 11 MW to 35 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 18,159 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.79538, -88.24696
Websitecyrusone.com/data-centers/north-america/aurora-il

Power and grid

Nearest high-voltage substationGFX Data Center Substation, 138 kV, 300 m away (Commonwealth Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationElectric Junction Substation, 345 kV, 1.2 km away
HV substations within 10 km18
UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNatural Gas PL Co of Am, interstate pipeline, 500 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km10.0 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.5 °C (2001 to 2025)
Cooling degree days465 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne data center in Aurora use?

We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.

How close is CyrusOne data center in Aurora to the power grid?

The nearest high-voltage substation in OpenStreetMap is GFX Data Center Substation (138 kV), about 300 m away. The local utility is Commonwealth Edison Co, in the PJM balancing area.

How clean is the power for CyrusOne data center in Aurora?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates CyrusOne data center in Aurora?

CyrusOne.

Data centers near Aurora

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.