Centersquare Northern Virginia (IAD1-C/E)
Centersquare Northern Virginia (IAD1-C/E) is an operational data center operated by Centersquare in Sterling, United States. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,282 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | Centersquare IAD1-C |
| Address | 21110 Ridgetop Circle |
| Coordinates | 39.02528, -77.41321 |
| Website | centersquaredc.com/data-centers/northern-virginia |
Power and grid
| Nearest high-voltage substation | DTC substation, 230 kV, 1.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 32 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 4.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centersquare Northern Virginia (IAD1-C/E) use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How close is Centersquare Northern Virginia (IAD1-C/E) to the power grid?
The nearest high-voltage substation in OpenStreetMap is DTC substation (230 kV), about 1.9 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Centersquare Northern Virginia (IAD1-C/E)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Centersquare Northern Virginia (IAD1-C/E)?
Centersquare.
Data centers near Sterling
- CyrusOne Sterling 79 m · 57 MW
- Centersquare Northern Virginia (IAD1-A/F) 216 m · 16 MW
- Amazon IAD-128 397 m · 19 MW
- EdgeCore VA1 403 m · 94 MW
- CyrusOne NVA8 456 m · 31 MW
- Amazon IAD-116 633 m · 11 MW
- Amazon IAD-174 1.3 km · 28 MW
- Amazon IAD-163 1.6 km · 18 MW
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Seattle (SEA1-B) United States
- Centersquare Dallas (DFW2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.