InterServer Teb2
InterServer Teb2 is an operational data center operated by InterServer in Secaucus, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | InterServer |
| Networks | 2 networks PeeringDB. |
| Also known as | InterServer Teb4 |
| Address | 110B Meadowlands Parkway |
| Coordinates | 40.78606, -74.07376 |
| Website | interserver.net/about/datacenter/secaucus-datacenter-teb2.html |
Power and grid
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for InterServer Teb2?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates InterServer Teb2?
InterServer.
Data centers near Secaucus
- H5 Secaucus 129 m
- H5 Data Centers Secaucus (NJ01) 252 m
- Centersquare New Jersey (EWR5) 391 m · 21 MW
- Evocative EWR1 515 m · 17 MW
- CoreSite - Secaucus (NY2) 748 m · 5.8 MW
- Equinix NY2/NY4/NY5/NY6 - New York, Secaucus 847 m · 29 MW
- NJDC2 - 300 J F Kennedy Blvd 934 m · 64 MW
- Equinix NY3 - New York, Secaucus 1.3 km · 9.2 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.