Equinix NY2/NY4/NY5/NY6 - New York, Secaucus
Equinix NY2/NY4/NY5/NY6 - New York, Secaucus is an operational data center operated by Equinix in Secaucus, United States. Our footprint estimate of its power is about 29 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 29 MW (range 14 MW to 46 MW) Estimate from building footprint, low confidence. Footprint estimate: about 24,051 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 132 networks, 10 internet exchanges PeeringDB. |
| Also known as | Equinix New York Secaucus NY5 · Equinix Secaucus NY6 |
| Address | 800 Secaucus Road |
| Coordinates | 40.77853, -74.07224 |
| Website | equinix.com/locations/americas-colocation/united-states-colocation/new-york-data-centers |
Power and grid
| Nearest high-voltage substation | Penhorn Substation, 230 kV, 2.2 km away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 39 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 20 GW in 142 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix NY2/NY4/NY5/NY6 - New York, Secaucus use?
We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.
How close is Equinix NY2/NY4/NY5/NY6 - New York, Secaucus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Penhorn Substation (230 kV), about 2.2 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for Equinix NY2/NY4/NY5/NY6 - New York, Secaucus?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates Equinix NY2/NY4/NY5/NY6 - New York, Secaucus?
Equinix.
Data centers near Secaucus
- NJDC2 - 300 J F Kennedy Blvd 319 m · 64 MW
- Equinix NY3 - New York, Secaucus 513 m · 9.2 MW
- H5 Data Centers Secaucus (NJ01) 777 m
- H5 Secaucus 798 m
- InterServer Teb2 847 m
- Centersquare New Jersey (EWR5) 888 m · 21 MW
- CoreSite - Secaucus (NY2) 894 m · 5.8 MW
- Evocative EWR1 1.1 km · 17 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.