Data Center Directory

CoreSite - Denver (DE1)

CoreSite - Denver (DE1) is an operational data center operated by CoreSite in Denver, United States. Our footprint estimate of its power is about 20 MW.

Key facts

StatusOperational
OperatorCoreSite
Facility power20 MW (range 10 MW to 32 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,798 m² building outline x 6 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks155 networks, 3 internet exchanges
PeeringDB.
Also known asInsurance Exchange Building
Address910 15th Street
Coordinates39.74564, -104.99564
Websitecoresite.com

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 1 km away (Public Service Company of Colorado)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km29
UtilityPublic Service Co Of Colorado (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPSCO
Nearest gas pipelineColorado Interstate Gas Co, interstate pipeline, 14.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.1 GW in 64 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity400 g CO₂ per kWh (Colorado, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6%
Industrial power priceUSD 0.100 per kWh (Colorado, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.1 °C (2001 to 2025)
Cooling degree days315 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.85 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayExtremely High (>80%) (Colorado)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CoreSite - Denver (DE1) use?

We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.

How close is CoreSite - Denver (DE1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1 km away. The local utility is Public Service Co Of Colorado, in the PSCO balancing area.

How clean is the power for CoreSite - Denver (DE1)?

The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.

Who operates CoreSite - Denver (DE1)?

CoreSite.

Data centers near Denver

More CoreSite data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.