Flexential - Denver/Aurora (DEN03)
Flexential - Denver/Aurora (DEN03) is an operational data center operated by Flexential in Aurora, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Networks | 15 networks, 2 internet exchanges PeeringDB. |
| Also known as | Flexential - Denver - Aurora |
| Address | 11900 E Cornell Ave |
| Coordinates | 39.66107, -104.84981 |
| Website | flexential.com |
Power and grid
| Utility | Public Service Co Of Colorado (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 7.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.1 °C (2001 to 2025) |
| Cooling degree days | 315 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.85 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Flexential - Denver/Aurora (DEN03)?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates Flexential - Denver/Aurora (DEN03)?
Flexential.
Data centers near Aurora
- H5 Data Centers Denver 6.0 km
- Time Warner Datacenter 6.9 km · 5.3 MW
- Flexential - Denver/Centennial (DEN05) 7.5 km · 4 MW
- DataBank Denver (DEN2) 7.8 km · 9.2 MW
- Xfinity/Comcast Data Center 8.2 km · 5.4 MW
- Equinix DE1 - Denver 8.3 km
- Verizon 8.3 km · 0.7 MW
- DataBank Denver (DEN1) 10.9 km · 1.3 MW
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.