Data Center Directory

Xfinity/Comcast Data Center

Xfinity/Comcast Data Center is an operational data center in Centennial, United States. Our footprint estimate of its power is about 5.4 MW.

Key facts

StatusOperational
Facility power5.4 MW (range 2.7 MW to 8.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,470 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSouth Potomac Street 7059, 80112, Centennial
Coordinates39.58832, -104.83242

Power and grid

UtilityCore Electric Cooperative (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPSCO
Nearest gas pipelineColorado Interstate Gas Co, interstate pipeline, 8.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity400 g CO₂ per kWh (Colorado, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6%
Industrial power priceUSD 0.100 per kWh (Colorado, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.1 °C (2001 to 2025)
Cooling degree days315 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.85 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayExtremely High (>80%) (Colorado)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Xfinity/Comcast Data Center use?

We estimate the facility power at about 5.4 MW. Estimate from building footprint, low confidence.

How clean is the power for Xfinity/Comcast Data Center?

The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.

Data centers near Centennial

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.