EdgeConneX Denver (EDCDEN01)

EdgeConneX Denver (EDCDEN01) is an operational data center operated by EdgeConneX in Englewood, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorEdgeConneX
Networks8 networks, 2 internet exchanges
PeeringDB.
Also known asEdgeConneX - DEN01
Address8535 Highfield Pkwy
Coordinates39.56107, -104.82667
Websiteedgeconnex.com

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 1.4 km away (Core Electric Cooperative)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJordan Substation, 230 kV, 3.9 km away
HV substations within 10 km16
UtilityCore Electric Cooperative (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPSCO
Nearest gas pipelineColorado Interstate Gas Co, interstate pipeline, 5.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.9 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity400 g CO₂ per kWh (Colorado, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6%
Industrial power priceUSD 0.100 per kWh (Colorado, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.1 °C (2001 to 2025)
Cooling degree days315 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.85 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayExtremely High (>80%) (Colorado)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How close is EdgeConneX Denver (EDCDEN01) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.4 km away. The local utility is Core Electric Cooperative, in the PSCO balancing area.

How clean is the power for EdgeConneX Denver (EDCDEN01)?

The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.

Who operates EdgeConneX Denver (EDCDEN01)?

EdgeConneX.

Data centers near Englewood

More EdgeConneX data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.