Time Warner Datacenter is an operational data center in Centennial, United States. Our footprint estimate of its power is about 5.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.3 MW (range 2.7 MW to 8.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,445 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | East Peakview Avenue 11011, 80111, Centennial |
| Coordinates | 39.59993, -104.86017 |
Power and grid
| Utility | Public Service Co Of Colorado (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 9.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.1 °C (2001 to 2025) |
| Cooling degree days | 315 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.85 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Time Warner Datacenter use?
We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.
How clean is the power for Time Warner Datacenter?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Data centers near Centennial
- Equinix DE1 - Denver 1.4 km
- DataBank Denver (DEN2) 1.5 km · 9.2 MW
- Flexential - Denver/Centennial (DEN05) 1.6 km · 4 MW
- Verizon 1.9 km · 0.7 MW
- Xfinity/Comcast Data Center 2.7 km · 5.4 MW
- H5 Data Centers Denver 3.4 km
- DataBank Denver (DEN1) 4.0 km · 1.3 MW
- Equinix DE2 - Denver 4.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.