Evocative BOS1
Evocative BOS1 is an operational data center operated by VPLS in Somerville, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | VPLS |
| Networks | 9 networks, 1 internet exchanges PeeringDB. |
| Address | 50 Inner Belt Road |
| Coordinates | 42.37793, -71.08042 |
| Website | evocative.com |
Power and grid
| Utility | Massachusetts Bay Trans Authority (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 403 g CO₂ per kWh (Massachusetts, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1% |
| Industrial power price | USD 0.200 per kWh (Massachusetts, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.82 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Massachusetts) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Evocative BOS1?
The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.
Who operates Evocative BOS1?
VPLS.
Data centers near Somerville
- CoreSite - Boston (BO1) 147 m · 12 MW
- Hub Express System 237 m
- Lumen Boston 1.3 km
- Markley Group One Summer Street Boston 3.1 km
- Expedient Boston 3.1 km
- 230 Congress 3.4 km
- Centersquare Boston (BOS4-A) 6.5 km
- EXA CLS Lynn 13.4 km
More VPLS data centers
- Evocative EWR1 United States
- Evocative DA4 United States
- Evocative SJC11 United States
- Evocative Virginia (VA1) United States
- Evocative SJC3 United States
- Evocative DAL6 United States
- Evocative Emeryville (EM1) United States
- Evocative LAX14 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.