Evocative DA4 is an operational data center operated by VPLS in Dallas, United States. Our footprint estimate of its power is about 9.9 MW.

Key facts

StatusOperational
OperatorVPLS
Facility power9.9 MW (range 5 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,258 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks42 networks, 4 internet exchanges
PeeringDB.
Also known asPrime DFW01-01
Address1515 Round Table Dr
Coordinates32.83797, -96.87831
Websiteevocative.com

Power and grid

UtilityHilco Electric Cooperative, INC. (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineAtmos Pipeline - Texas, intrastate pipeline, 10.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.3 °C (2001 to 2025)
Cooling degree days1,559 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.64 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Evocative DA4 use?

We estimate the facility power at about 9.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Evocative DA4?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Evocative DA4?

VPLS.