Data Center Directory

Prime DFW01-01

Prime DFW01-01 is an operational data center operated by Prime in Dallas, United States. Our footprint estimate of its power is about 6.7 MW.

Key facts

StatusOperational
OperatorPrime
Facility power6.7 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,591 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressRound Table Drive 1515, 75247, Dallas
Coordinates32.83781, -96.87985
Websiteprimedatacenters.com/locations/dallas

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 4.4 km away
HV substations within 10 km45
UtilityHilco Electric Cooperative, INC. (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineAtmos Pipeline - Texas, intrastate pipeline, 10.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.6 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.3 °C (2001 to 2025)
Cooling degree days1,559 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.64 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Prime DFW01-01 use?

We estimate the facility power at about 6.7 MW. Estimate from building footprint, low confidence.

How close is Prime DFW01-01 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1 km away. The local utility is Hilco Electric Cooperative, INC., in the ERCO balancing area.

How clean is the power for Prime DFW01-01?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Prime DFW01-01?

Prime.

Data centers near Dallas

More Prime data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.