Evocative DAL6
Evocative DAL6 is an operational data center operated by VPLS in Plano, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | VPLS |
| Networks | 12 networks, 1 internet exchanges PeeringDB. |
| Address | 1221 Coit Rd |
| Coordinates | 33.01568, -96.76842 |
| Website | evocative.com |
Power and grid
| Utility | Grayson-Collin Elec Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 13.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 1,559 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.64 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Evocative DAL6?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Evocative DAL6?
VPLS.
Data centers near Plano
- Lincoln Rackhouse Dallas 214 m
- NVIDIA CoreWeave Eos-DFW 334 m · 16 MW
- Flexential - Dallas/Richardson (RCH01) 2.7 km
- Flexential Dallas - Richardson 2.8 km · 23 MW
- Equinix DA7 - Dallas 6.8 km
- Digital Realty DFW (4025 Midway Road) 7.1 km
- 365 Data Centers Richardson (TX1) 7.2 km
- Digital Realty DFW (1232 Alma) 7.4 km · 10 MW
More VPLS data centers
- Evocative EWR1 United States
- Evocative DA4 United States
- Evocative SJC11 United States
- Evocative Virginia (VA1) United States
- Evocative SJC3 United States
- Evocative BOS1 United States
- Evocative Emeryville (EM1) United States
- Evocative LAX14 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.