Data Center Directory

Evocative SJC11

Evocative SJC11 is an operational data center operated by VPLS in Santa Clara, United States. Our footprint estimate of its power is about 7.5 MW.

Key facts

StatusOperational
OperatorVPLS
Facility power7.5 MW (range 3.8 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,286 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks8 networks, 1 internet exchanges
PeeringDB.
Also known asEvocative Santa Clara SJC11
Address2151 Mission College Blvd
Coordinates37.38947, -121.96211
Websiteinternap.com

Power and grid

Nearest high-voltage substationNorthern Receiving Station, 230 kV, 1.4 km away (Silicon Valley Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km30
UtilityCity Of Santa Clara (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityCISO
Nearest gas pipelineCalifornia Gas Transmission Co, intrastate pipeline, 100 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.1 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity189 g CO₂ per kWh (California, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7%
Industrial power priceUSD 0.241 per kWh (California, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.3 °C (2001 to 2025)
Cooling degree days370 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.32 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (California)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Evocative SJC11 use?

We estimate the facility power at about 7.5 MW. Estimate from building footprint, low confidence.

How close is Evocative SJC11 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Northern Receiving Station (230 kV), about 1.4 km away. The local utility is City Of Santa Clara, in the CISO balancing area.

How clean is the power for Evocative SJC11?

The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.

Who operates Evocative SJC11?

VPLS.

Data centers near Santa Clara

More VPLS data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.