Digital Realty BOS14 - Boston is an operational data center operated by Digital Realty in Needham, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Networks | 8 networks, 1 internet exchanges PeeringDB. |
| Address | 128 First Avenue |
| Coordinates | 42.30132, -71.21903 |
| Website | digitalrealty.com |
Power and grid
| Nearest high-voltage substation | Newton Highlands Substation, 115 kV, 1.9 km away (Eversource) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hyde Park Substation, 345 kV, 8.7 km away |
| HV substations within 10 km | 10 |
| Utility | Town Of Braintree (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 700 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.0 GW in 178 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 403 g CO₂ per kWh (Massachusetts, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1% |
| Industrial power price | USD 0.200 per kWh (Massachusetts, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.82 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Massachusetts) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Digital Realty BOS14 - Boston to the power grid?
The nearest high-voltage substation in OpenStreetMap is Newton Highlands Substation (115 kV), about 1.9 km away. The local utility is Town Of Braintree, in the ISNE balancing area.
How clean is the power for Digital Realty BOS14 - Boston?
The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.
Who operates Digital Realty BOS14 - Boston?
Digital Realty.
Data centers near Needham
- LightWave Networks 115 m
- Centersquare Boston (BOS4-A) 8.7 km
- Cogent Boston 10.7 km
- Equinix BO1 - Boston, Waltham 11.2 km
- ColoSpace - Waltham, MA 11.3 km
- Centersquare Boston (BOS1-A) 11.3 km
- Lumen Boston 13.1 km
- Hub Express System 14.1 km
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.