Cogent Boston is an operational data center operated by Cogent Communications in Waltham, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cogent Communications |
| Address | 100 5th Ave |
| Coordinates | 42.39319, -71.25573 |
| Website | cogentco.com/en/cogent-boston |
Power and grid
| Nearest high-voltage substation | Waltham Substation, 230 kV, 1.8 km away (Eversource) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 10 |
| Utility | Massachusetts Bay Trans Authority (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.4 GW in 168 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 403 g CO₂ per kWh (Massachusetts, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1% |
| Industrial power price | USD 0.200 per kWh (Massachusetts, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.81 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Massachusetts) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Cogent Boston to the power grid?
The nearest high-voltage substation in OpenStreetMap is Waltham Substation (230 kV), about 1.8 km away. The local utility is Massachusetts Bay Trans Authority, in the ISNE balancing area.
How clean is the power for Cogent Boston?
The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.
Who operates Cogent Boston?
Cogent Communications.
Data centers near Waltham
- ColoSpace - Waltham, MA 774 m
- Centersquare Boston (BOS1-A) 1.0 km
- Equinix BO1 - Boston, Waltham 1.1 km
- Centersquare Boston (BOS4-A) 8.6 km
- LightWave Networks 10.5 km
- Digital Realty BOS14 - Boston 10.7 km
- Lumen Boston 14.2 km
- Hub Express System 14.5 km
More Cogent Communications data centers
- Cogent Elkridge United States
- Cogent Data Center United States
- Cogent Dijon France
- Cogent Toulouse France
- Cogent Tours France
- Cogent Lille France
- Cogent Rouen France
- Omaha Switch United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.