Data Center Directory

Cogent Toulouse

Cogent Toulouse is an operational data center operated by Cogent Communications in Toulouse, France. Our footprint estimate of its power is about 2.2 MW.

Key facts

StatusOperational
OperatorCogent Communications
Facility power2.2 MW (range 1.1 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,831 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 940 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks17 networks, 1 internet exchanges
PeeringDB.
Address125bis ch du Sang de Serp
Coordinates43.62045, 1.42310
Websitecogentco.com

Power and grid

Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.8 °C (2001 to 2025)
Cooling degree days478 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow - Medium (10-20%) (Occitanie)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cogent Toulouse use?

We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.

How clean is the power for Cogent Toulouse?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Cogent Toulouse?

Cogent Communications.

Data centers near Toulouse

More Cogent Communications data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.