Centrinuity Toulouse
Centrinuity Toulouse is an operational data center operated by Centrinuity Toulouse in Toulouse Balma, France. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centrinuity Toulouse |
| Facility power | 0.8 MW (range 0.4 MW to 1.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 703 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks PeeringDB. |
| Also known as | ETIX Toulouse #1 |
| Address | 10 rue des Freres Peugeot |
| Coordinates | 43.62550, 1.48706 |
| Website | centrinuity.com |
Power and grid
| Nearest high-voltage substation | Poste électrique de Balma, 225 kV, 1.2 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 403 MW in 55 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.8 °C (2001 to 2025) |
| Cooling degree days | 478 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Occitanie) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centrinuity Toulouse use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Centrinuity Toulouse to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Balma (225 kV), about 1.2 km away.
How clean is the power for Centrinuity Toulouse?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Centrinuity Toulouse?
Centrinuity Toulouse.
Data centers near Toulouse Balma
- 10 Rue des Frères Peuge 128 m
- Bouygues Télécom data center in Toulouse 1.4 km · 1.9 MW
- EXA Edge DC Toulouse 5.0 km
- Cogent Toulouse 5.2 km · 2.2 MW
- Eurofiber DC - TLS00 5.3 km · 4.7 MW
- UltraEdge Toulouse 5.5 km
- Hotel des Telecoms 9.4 km · 4.1 MW
- Oscar 10.0 km · 8.4 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.