Data Center Directory

Eurofiber DC - TLS00

Eurofiber DC - TLS00 is an operational data center operated by Etix Everywhere in Toulouse, France. Our footprint estimate of its power is about 4.7 MW.

Key facts

StatusOperational
OperatorEtix Everywhere
Facility power4.7 MW (range 2.4 MW to 7.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,929 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks25 networks, 1 internet exchanges
PeeringDB.
Also known asETIX Toulouse #2
Address131 chemin du Sang de Serp
Coordinates43.61990, 1.42135
Websitetls00.fr

Power and grid

Nearest high-voltage substationPoste électrique de Toulouse-Centre, 225 kV, 2.7 km away (Enedis)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
Power plants within 50 km390 MW in 54 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.8 °C (2001 to 2025)
Cooling degree days478 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow - Medium (10-20%) (Occitanie)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Eurofiber DC - TLS00 use?

We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.

How close is Eurofiber DC - TLS00 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Toulouse-Centre (225 kV), about 2.7 km away.

How clean is the power for Eurofiber DC - TLS00?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Eurofiber DC - TLS00?

Etix Everywhere.

Data centers near Toulouse

More Etix Everywhere data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.