ETIX Nantes #3
ETIX Nantes #3 is an operational data center operated by Etix Everywhere in Couëron, France. Our footprint estimate of its power is about 4.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Etix Everywhere |
| Facility power | 4.7 MW (range 2.4 MW to 7.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,951 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks PeeringDB. |
| Address | 1 RUE DES FORGERONS, 44220 Couëron |
| Coordinates | 47.23842, -1.66736 |
| Website | etixeverywhere.com |
Power and grid
| Nearest high-voltage substation | Poste électrique de la Chabossière, 225 kV, 3.8 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.9 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 121 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.48 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Pays de la Loire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ETIX Nantes #3 use?
We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.
How close is ETIX Nantes #3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de la Chabossière (225 kV), about 3.8 km away.
How clean is the power for ETIX Nantes #3?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates ETIX Nantes #3?
Etix Everywhere.
Data centers near Couëron
- OT - Armor 2.9 km · 6.1 MW
- SFR data center in Saint-Herblain 2.9 km · 2.6 MW
- UltraEdge Rezé 9.3 km · 1.5 MW
- Cogent Nantes 9.7 km
- Bouygues Télécom data center in La Chapelle-sur-Erdre 9.8 km · 1.1 MW
- Sigma DC3 15.6 km · 3.7 MW
- Proginov 18.6 km · 11 MW
- Station d'atterrage 60.7 km · 1.6 MW
More Etix Everywhere data centers
- Eurofiber DC - TLS00 France
- ETIX Lille #2 France
- Hotel des Telecoms France
- ETIX Lille #1 France
- ETIX Paris #3 France
- ETIX Bangkok #1 Thailand
- ETIX BelgiumDC #1 Belgium
- ETIX Lille #3 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.