Proginov
Proginov is an operational data center in La Chevrolière, France. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,141 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue de la Guillauderie 36, 44118, La Chevrolière |
| Coordinates | 47.08921, -1.55547 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 11.6 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 1.5 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 121 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.48 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Pays de la Loire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Proginov use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Proginov to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 11.6 km away.
How clean is the power for Proginov?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near La Chevrolière
- UltraEdge Rezé 11.9 km · 1.5 MW
- Cogent Nantes 12.7 km
- SFR data center in Saint-Herblain 16.2 km · 2.6 MW
- OT - Armor 16.8 km · 6.1 MW
- ETIX Nantes #3 18.6 km · 4.7 MW
- Bouygues Télécom data center in La Chapelle-sur-Erdre 20.8 km · 1.1 MW
- Sigma DC3 21.9 km · 3.7 MW
- ETIX Vendée #1 49.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.