UltraEdge Rezé
UltraEdge Rezé is an operational data center operated by UltraEdge in Rezé, France. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | UltraEdge |
| Facility power | 1.5 MW (range 0.8 MW to 2.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,289 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Address | 24 rue Felix Eboué |
| Coordinates | 47.19647, -1.56105 |
| Website | ultraedge.com |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 121 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.48 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Pays de la Loire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does UltraEdge Rezé use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How clean is the power for UltraEdge Rezé?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates UltraEdge Rezé?
UltraEdge.
Data centers near Rezé
- Cogent Nantes 1.1 km
- SFR data center in Saint-Herblain 6.4 km · 2.6 MW
- OT - Armor 6.6 km · 6.1 MW
- Bouygues Télécom data center in La Chapelle-sur-Erdre 8.9 km · 1.1 MW
- ETIX Nantes #3 9.3 km · 4.7 MW
- Sigma DC3 11.4 km · 3.7 MW
- Proginov 11.9 km · 11 MW
- Station d'atterrage 60.4 km · 1.6 MW
More UltraEdge data centers
- UltraEdge Strasbourg France
- UltraEdge Velizy France
- UltraEdge Lyon-Venissieux France
- UltraEdge Rennes France
- UltraEdge Bordeaux France
- Ultraedge Canteleu France
- UltraEdge Grenoble France
- UltraEdge Lille France
Sources
Correct this page or get the data