Data Center Directory

UltraEdge Strasbourg

UltraEdge Strasbourg is an operational data center operated by UltraEdge in Strasbourg, France. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
OperatorUltraEdge
Facility power19 MW (range 9.3 MW to 30 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 15,441 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks42 networks, 1 internet exchanges
PeeringDB.
Also known asDatadock
Address1 rue du Havre
Coordinates48.56915, 7.78115
Websiteultraedge.com

Power and grid

Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.1 °C (2001 to 2025)
Cooling degree days139 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.25 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does UltraEdge Strasbourg use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

How clean is the power for UltraEdge Strasbourg?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates UltraEdge Strasbourg?

UltraEdge.

Data centers near Strasbourg

More UltraEdge data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.