Bouygues Télécom data center in Hœnheim
Bouygues Télécom data center in Hœnheim is an operational data center operated by Bouygues Télécom in Hœnheim, France. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bouygues Télécom |
| Facility power | 0.8 MW (range 0.4 MW to 1.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 644 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.63360, 7.76925 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Reichstett, 225 kV, 3.1 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 862 MW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.1 °C (2001 to 2025) |
| Cooling degree days | 139 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Medium - High (20-40%) (Grand Est) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bouygues Télécom data center in Hœnheim use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Bouygues Télécom data center in Hœnheim to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Reichstett (225 kV), about 3.1 km away.
How clean is the power for Bouygues Télécom data center in Hœnheim?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Bouygues Télécom data center in Hœnheim?
Bouygues Télécom.
Data centers near Hœnheim
- Cogent Strasbourg 4.1 km · 0.6 MW
- EXA Edge DC Strasbourg 4.9 km · 1.4 MW
- OVHcloud Strasbourg - SBG-5 5.6 km · 1.7 MW
- EXA Edge DC Kehl 6.7 km
- UltraEdge Strasbourg 7.2 km · 19 MW
- SFR Netcenter Strasbourg 7.3 km
- Association Alsace Reseau Neutre 7.4 km
- nLighten Strasbourg SXB1 12.8 km · 3.7 MW
More Bouygues Télécom data centers
- Datacenter Bouygues Télécom France
- Datacenter Bouygues Télécom France
- Bouygues Telecom data center in Cabriès France
- Bouygues Télécom data center in Montpellier France
- Bouygues Télécom data center in Poitiers France
- Bouygues Télécom data center in Toulouse France
- Bouygues Télécom data center in Léognan France
- Bouygues Télécom data center in Nanterre France