Bouygues Télécom data center in Léognan is an operational data center operated by Bouygues Télécom in Léognan, France. Our footprint estimate of its power is about 1.8 MW.

Key facts

StatusOperational
OperatorBouygues Télécom
Facility power1.8 MW (range 0.9 MW to 2.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,485 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 770 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates44.72433, -0.52980

Power and grid

Nearest high-voltage substationPoste électrique de Floirac, 225 kV, 10.7 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km1.1 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43 °C (2001 to 2025)
Cooling degree days373 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.77 kWh per m² per day
Wind at 50 m4.1 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Bouygues Télécom data center in Léognan use?

We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.

How close is Bouygues Télécom data center in Léognan to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Floirac (225 kV), about 10.7 km away.

How clean is the power for Bouygues Télécom data center in Léognan?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Bouygues Télécom data center in Léognan?

Bouygues Télécom.

Data centers near Léognan

More Bouygues Télécom data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.