Equinix BX1 - Bordeaux
Equinix BX1 - Bordeaux is an operational data center operated by Equinix in Bruges, France. Our footprint estimate of its power is about 3.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 3.4 MW (range 1.4 MW to 8.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,658 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 9 networks, 1 internet exchanges PeeringDB. |
| Also known as | Equinix |
| Address | 39 Rue de Strasbourg |
| Coordinates | 44.89582, -0.61139 |
| Website | equinix.com/data-centers/europe-colocation/france-colocation/bordeaux-data-centers/bx1 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Bruges, 225 kV, 2.1 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 4.9 GW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 335 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.72 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix BX1 - Bordeaux use?
We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.
How close is Equinix BX1 - Bordeaux to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Bruges (225 kV), about 2.1 km away.
How clean is the power for Equinix BX1 - Bordeaux?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Equinix BX1 - Bordeaux?
Equinix.
Data centers near Bruges
- Aliénor.net 2.6 km · 0.6 MW
- UltraEdge Bordeaux 4.3 km
- SFR Netcenter Bordeaux 4.4 km · 8.7 MW
- Cogent Bordeaux 5.7 km
- TDF Datacenter Bordeaux Bouliac 11.9 km
- EXA Edge DC Bordeaux 14.0 km · 1.3 MW
- Bouygues Télécom data center in Léognan 20.1 km · 1.8 MW
- EXA Edge DC Ychoux 68.1 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.