TDF Datacenter Bordeaux Bouliac
TDF Datacenter Bordeaux Bouliac is an operational data center operated by TDF in Bouliac, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | TDF |
| Networks | 7 networks PeeringDB. |
| Also known as | TDF ProxiCenter Bordeaux Bouliac |
| Address | 26 Avenue du Domaine de Vialle |
| Coordinates | 44.81967, -0.50544 |
| Website | tdf.fr |
Power and grid
| Nearest high-voltage substation | Poste électrique de Floirac, 225 kV, 1.5 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.1 GW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 335 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.72 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is TDF Datacenter Bordeaux Bouliac to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Floirac (225 kV), about 1.5 km away.
How clean is the power for TDF Datacenter Bordeaux Bouliac?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates TDF Datacenter Bordeaux Bouliac?
TDF.
Data centers near Bouliac
- EXA Edge DC Bordeaux 5.0 km · 1.3 MW
- Cogent Bordeaux 6.3 km
- SFR Netcenter Bordeaux 8.7 km · 8.7 MW
- UltraEdge Bordeaux 8.7 km
- Aliénor.net 9.5 km · 0.6 MW
- Bouygues Télécom data center in Léognan 10.8 km · 1.8 MW
- Equinix BX1 - Bordeaux 11.9 km · 3.4 MW
- EXA Edge DC Ychoux 64.6 km
More TDF data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.