TDF Datacenter Lille Lambersart
TDF Datacenter Lille Lambersart is an operational data center operated by TDF in Lambersart, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | TDF |
| Networks | 4 networks PeeringDB. |
| Address | 251 Avenue du Bois, Parc du Pont Royal |
| Coordinates | 50.64755, 3.04262 |
| Website | tdf.fr |
Power and grid
| Nearest high-voltage substation | Poste électrique de Vertefeuille, 225 kV, 3.2 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 10 |
| Power plants within 50 km | 1.0 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 67 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.11 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Hauts-de-France) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is TDF Datacenter Lille Lambersart to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Vertefeuille (225 kV), about 3.2 km away.
How clean is the power for TDF Datacenter Lille Lambersart?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates TDF Datacenter Lille Lambersart?
TDF.
Data centers near Lambersart
- TDF ProxiCenter Lille Lambersart 209 m · 4.5 MW
- UltraEdge Lille 2.3 km
- Lille Boitelle 3.4 km
- Cogent Lille 3.6 km · 1 MW
- Oxya Datacenter 3.7 km · 2.5 MW
- SM4 3.8 km · 3.5 MW
- Bouygues Télécom data center in Loos 4.1 km · 0.8 MW
- Centre de données 4.1 km · 15 MW
More TDF data centers