Centre de données
Centre de données is an operational data center in Verlinghem, France. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 15 MW (range 7.4 MW to 24 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,274 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Verlinghem |
| Coordinates | 50.68001, 3.01636 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Vertefeuille, 225 kV, 1.5 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 13 |
| Power plants within 50 km | 925 MW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 67 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.11 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Hauts-de-France) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centre de données use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How close is Centre de données to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Vertefeuille (225 kV), about 1.5 km away.
How clean is the power for Centre de données?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near Verlinghem
- SM4 271 m · 3.5 MW
- TDF ProxiCenter Lille Lambersart 3.9 km · 4.5 MW
- TDF Datacenter Lille Lambersart 4.1 km
- UltraEdge Lille 5.9 km
- EXA Edge DC Sequedin 6.1 km
- Cogent Lille 7.0 km · 1 MW
- Oxya Datacenter 7.0 km · 2.5 MW
- Lille Boitelle 7.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.